13 KiB
Rundown evaluation corpus
The supplied corpus now includes five XLSX workbooks (seven sheets) and two PDFs.
The five workbooks are tracked at the user's request, with normalized filenames
and unchanged contents; see the fixture inventory and
original-name/checksum manifest. Four offline integration
tests exercise all seven sheets through the real reader and pipeline. PDFs and
generated exports remain ignored. Seven public XLSX downloads and three public
CSV files remain local evaluation inputs under downloads/rundown-corpus/.
The public source manifest records download URLs, source pages, SHA-256 hashes and retrieval date. Downloads are manual research inputs, never a network dependency of CI. Templates are not a representative accuracy benchmark; these observations establish specific behaviors and limitations, not a general success percentage.
Supplied examples
| Example | Evidence and result |
|---|---|
| ESTIVALES, OUVERTURE | Correctly identifies Heure, Durée and Contenu / Détail. Shared merged durations remain one timer; merged windows with individual durations become consecutive cues with leftover slack. Untimed production directions need a note classification. Final 11:45 cue lacks duration and blocks export pending clarification. |
| ESTIVALES, CLOTURE | Five timing blocks. With the explicit untimed_as_notes policy, converts to five timers; all original continuation/direction rows remain in the IR; exported notes depend on the selected Notes columns. This policy is a test scenario, not a confirmed interpretation from the owner. |
| Plénière 2, Feuil1 | Both C and D are named TIMER and contain plausible durations. Returns AMBIGUOUS_COLUMN; parent-segment versus child-cue timing needs clarification. No automatic conversion is claimed. |
| GIFAV 2026 Auditorium | Horaires contains consistent parent-session start/end ranges and is detected as a combined Start–end column. Durée mixes child ranges with speaking/QA text, so it cannot be flattened into one duration role. Mapping Start–end to A and Title to D, retaining presentations as notes, validates Thursday with 11 entries and three gaps. Friday reaches schedule validation with 10 entries and three gaps, then correctly reports the source overlap between the 13:45–15:45 poster session and the 14:45–15:45 following session. |
| Montage PDF | Text is extractable, but includes overlapping logistics tasks, missing durations and different locations. Not a single established timer sequence. |
| Exploitation/démontage PDF | Text is extractable; page-spanning directions, simultaneous activities and untimed arrivals require track and row classification. PDF import remains a stretch goal. |
The supplied originals contain production details and contacts. The five tracked
workbooks were explicitly approved for Git inclusion by the user; this does not
assert a blanket redistribution license for third-party material. Test assertions
and documentation avoid reproducing their production text. An unchanged local file can be inspected with
rundown-converter inspect INPUT --json; this output contains the original cells,
so treat it like the source document.
PDF feasibility trial
A bounded follow-up trial attempted automatic table recovery from all 17 pages
of the two supplied PDFs. Result: useful text/table recovery, but no dependable
whole-document timer conversion. PDF importer work is paused; the application
continues to return PDF_REQUIRES_REVIEW. This is a finding about these samples,
not evidence that all PDF rundowns are unsuitable.
Extraction attempts
First compare pdftotext -layout with word coordinates from
pdftotext -bbox-layout. Plain reading order sometimes joins a clock and its
activity, while multiline cells and vertically centred text prevent reliable
row detection from baselines alone. The rendered first page of each document
was inspected to compare the recovered coordinates with the visible grid.
Then use pdftocairo -svg to recover the table borders. In these files the borders
are thin filled rectangles. A temporary Python standard-library prototype
clusters their coordinates into column boundaries and row bands, assigns words
by their bounding-box centres, and records missing horizontal borders as possible
vertical cell spans. This is specific to ruled, text-based PDFs; it does not
establish support for scans, borderless tables or other PDF drawing conventions.
The first geometry pass lost a column on two Montage continuation pages where the left border was absent. It also missed text above the first visible border on some pages. A second pass aligns column boundaries across the document and extends the outer row bounds to include body text. It recovers four columns for Montage and five for Exploitation on every page.
| Measurement | Montage | Exploitation/démontage |
|---|---|---|
| Pages | 4 | 13 |
| Nonempty geometric row bands | 33 | 123 |
| Body words assigned to cells | 714 | 2,645 |
| Repeated page-heading words excluded | 16 | 39 |
| Populated time cells | 13 | 46 |
| Explicit start/end ranges | 1 | 15 |
| Start-only cells | 9 | 31 |
| Other time-cell values | TBC, 01H/2H, 2H MAX |
None |
All non-heading words were assigned in this second pass. That is extraction coverage, not proof that every cell boundary, inherited start or event grouping is correct. Row bands are geometric subdivisions, not a count of semantic events. Missing grid borders and cross-page continuations still need interpretation.
Timing experiment and stop decision
For a deliberately generous trial, write the recovered rows to temporary CSVs
with guessed Start/Title/Owner/Location/Notes headers and enable the existing
untimed_as_notes policy. No start or duration is filled from the next row.
Keep page/bounding-box and possible-merge evidence in separate temporary JSON;
this CSV trial does not resolve or automatically apply those ambiguous spans.
Montage stops at column validation on its three unresolved time-cell values. Exploitation reaches IR construction but reports 31 missing durations. Its 12 orphan-note diagnostics are downstream consequences of unresolved preceding events, not 12 additional extraction failures. A shared time cell can cover several simultaneous tasks; treating them as consecutive cues is unjustified.
As a diagnostic only, test the explicit-range subset separately. Montage's single range validates, but that excludes almost the entire document. Exploitation's 15 ranges yield 14 candidate timers and one untimed break, with six overlapping predecessor pairs and three gap-overlap diagnostics. This subset also omits the 31 start-only entries, so it is not an acceptable converted rundown even if those conflicts were removed. No partial Ontime project was published.
The remaining obstacles are semantic: selecting simultaneous tracks, deciding whether rows without a timing are instructions or events, distinguishing arrivals and cutoff markers from timers, and interpreting uncertain overnight deadlines. Neither a following start nor a missing table border supplies that information. Per the requested stop condition, no experimental reader or new runtime dependency was added. Revisit with a sequential PDF containing explicit durations/end times, or after adding explicit track and row-role selection to the neutral model. Temporary extractions and the prototype stay outside Git; no private PDF content or contact details are redistributed.
Public examples
| Source | Result and useful variation |
|---|---|
| Stagetimer | Header below title blocks, Excel serial times, formula placeholders. The populated row has inconsistent start/end/duration values; validation returns CONFLICTING_TIMES. |
| Attenditai | Instruction sheet plus blank formula-driven schedule. Formula cells without usable cached values require recalculation/population; no invented events. |
| Joinways | AM/PM times, section labels embedded in the clock column, parallel setup tasks. Unmerged labels require explicit row classifications before column inference can succeed; overlaps then require separate tracks. |
| LiveFocus | Three sheets, cached formula durations in minutes and fractional-day clocks. Minute units are inferred from start/end pairs. Blank formula rows and full-width merged footer are structural. The completed example reports overlapping activities. |
| Novus | String clock times and two-part durations. Whole-column comparison with start/end pairs establishes hh:mm; the populated XLSX sheet converts without a profile. |
| Events Authority | Two sheets, a title block, Excel clock values and chained formulas. The main schedule infers start/end/title and validates nine events plus one gap after its total row is explicitly ignored. The preparation sheet is correctly kept separate. |
| Arena Takeover | A sports cue sheet mixes countdowns (T-30:00), elapsed time, quarter clock, halftime and final-game tokens in one clock column. It fails whole-column validation instead of pretending these are one wall-clock schedule; durations also require an explicit unit. |
| LASSO broadcast | A compact broadcast CSV uses Item as its title header and mm:ss durations. Manual mapping reaches IR construction, where a cue without a duration remains an actionable blocker. |
| LASSO corporate | A conference CSV interleaves timed cues with session headings and end markers. Manual mapping exposes those rows for classification and leaves the final missing duration unresolved rather than silently dropping it. |
| The AV Company | Instructions, blank template and populated example sheets, with a two-level visual header, Excel fractional-day durations, continuation notes and a final -- marker. Explicit header/column choices and three row classifications produce a valid 20-event schedule. The workbook also contains formatting far beyond the visible data columns, which remains harmless but verbose in inference evidence. |
Two additional institutional sources (Moira Shire and Monash University) rejected requests with HTTP 403. A speaker toolkit page exposed no direct workbook link. No authentication or access restrictions were bypassed.
The second search deliberately retained cases that fail or need review. They add
relative sports clocks, broadcast mm:ss, structural session rows, two-level
headers, preparation sheets and wide production metadata; a corpus of only
successful single-track schedules would not exercise the converter's stop rules.
Ontime verification
Generated native JSON was run through Ontime's actual rundown parser and metadata
calculation from version 4.15.1, source commit
0fe52483eb756228589321b83c3b0f810dfb36b1.
The synthetic lunch example preserves all four events, their start/end/duration
values and unlinked starts; Ontime calculates a 5,400,000 ms gap before resumption.
The five-event closing-sheet scenario and eleven-event public Novus example
also preserve every timer through that parser. This verifies parser and schedule
semantics, not an operated live show or every
Ontime project section. The user's installed version still needs confirmation.
Regression coverage
Synthetic tests cover whole-column contradictions, duplicate TIMER headers,
ambiguous duration units resolved by other rows, Excel time values and merges,
notes/markers, gaps, conflicting triples, backward times, negative durations,
output collisions, source preservation, cancellation, CLI exit codes and desktop
worker state. tests/supplied_corpus.rs additionally tests French header detection
and typed Excel durations in both Moebius files, duplicate timers in Plénière 2,
merged blocks and source-row retention in ESTIVALES, and parent ranges, gaps and
the real Friday overlap in GIFAV. These tests are offline and never write exports
beside the fixtures. Public downloads remain outside CI.
Validation of the first implementation
All workspace Rust tests and 43 Python tests passed, along with formatting, Clippy and warning-free Rustdoc. Whole-workspace line coverage is 86.20% against the 75% gate, including production GUI/PDF code. The native converter Setup window was visually inspected; headless egui tests exercise Review/Results, compact layouts, worker completion, errors and export. Full interactive operation on Windows/macOS and a live Ontime playback session have not been verified.